Halfway through the month of September the Eastern moorings of the Terminal quay were completely equipped.
Halfway through the month of September the Eastern moorings of the Terminal quay were completely equipped.
The reinforcement work of the quay at the PSA Voltri Pra’ Terminal has begun, compatible with the installation of the latest generation of bollards with a 150-tonne capacity.